Our Work
Every project is a promise kept. Browse our completed work across Augusta and the surrounding CSRA — quality you can see, craftsmanship you can trust.
CommercialAfterPrimrose School of Martinez
Multi-trade interior subcontract on a ground-up childcare facility for a national general contractor: drywall hung and finished to Level 5, acoustical ceiling grid and tile, the door and hardware package, and FRP wall panel systems.
CommercialAfterAcoustical Ceilings, Doors & Hardware
Finished corridor at Primrose School — acoustical grid and tile overhead, door and hardware package set, drywall finished and painted out.
CommercialAfterLevel 5 Drywall & Ceiling Grid
Classroom at Primrose School with acoustical grid hung and drywall finished to Level 5, ready for ceiling tile and final paint.
CommercialIn progressAfterVeterans Housing Rehabilitation
Full gut rehabilitation of a nonprofit veterans housing property in Augusta. The structure was opened back to the studs, then rebuilt with drywall, tile, attic insulation and paint.
CommercialChurch Steeple & Cupola Work
Crew working a steeple and cupola assembly on a church roof — exterior carpentry and trim at height.
RoofingAfterStorm Damage — Roof & Structure Rebuild
Storm-damaged home with structural debris across the site. The roof was tarped to stop further water intrusion, then torn off and fully replaced.
RoofingAfterHail Claim Roof Replacement
Roof replaced after a hail claim — the before frame still carries the adjuster's chalk test squares. Completed work documented by drone.
RoofingEmergency Tarp & Eave Repair
Damaged eave and roof edge tarped and secured ahead of full replacement, with ladder access staged off the gable end.
RoofingCompleted Roof Replacement
Finished shingle roof on a brick ranch, shot from the ground after tear-off and replacement.
RoofingFull Roof Replacement — Aerial
Aerial view of a multi-gable residential replacement with synthetic underlayment installed ahead of the shingle course.
RoofingSynthetic Underlayment Detail
Gable end dried in with synthetic underlayment before shingles go down — the step that keeps water out while the roof is open.
RoofingSkylight Installation
Skylight set and flashed into an existing shingle roof.
InteriorsAfterBathroom Taken to the Studs & Rebuilt
Same tub, same wall: stripped back to the studs, waterproofed, then tiled with a recessed niche and new fixtures. Completed on a property-management work order.
InteriorsShower Waterproofing Before Tile
Waterproof backer membrane installed over the tub surround with the niche framed in — the layer that decides whether a tiled shower lasts.
InteriorsBathroom — Vanity, Tile & Fixtures
Completed bathroom with new vanity, mirror, tile floor and fixtures following the tub and shower rebuild.
InteriorsAfterCeiling Opened, Patched & Finished
Same ceiling: opened to the joists for access, then closed back up, patched and floated flush with the surrounding ceiling ahead of paint.
InteriorsAfterDrywall Repair & Finishing
Wall opened for access and patched back in, with our finisher floating a ceiling repair on the same job.
InteriorsAfterRental Unit Turn — Bathroom
Same bathroom in a rental unit turned between tenants: new flooring, vanity, fixtures and paint throughout.
InteriorsRental Unit Turn — Kitchen
Kitchen refreshed during a between-tenant turn — cabinets, counters, appliances and new luxury vinyl plank flooring.
InteriorsRental Unit Turn — Living Area
Living area after a full turn: new luxury vinyl plank flooring, fresh paint and trim throughout.
InteriorsBook-Matched Shower Wall
Large-format porcelain panels run floor to ceiling with matched veining through the wall.
InteriorsBathroom Floor Tile
Floor tile set with levelling clips ahead of grout, tub and surround already in place.
InteriorsFireplace Mantel & Surround
Completed painted mantel and trim with tile surround and hearth.
ExteriorsSiding & Exterior Repair
Crew working the rear elevation during siding and trim replacement.
ExteriorsExterior Elevation — Siding Work
Siding and exterior repairs underway on a two-storey elevation with chimney.
ExteriorsChurch Exterior
Completed exterior of a church project — steeple, columns and front elevation.
Ready for your project?
Homeowners, property managers and general contractors across the CSRA have trusted Kingdom Craft Construction with their projects. Yours could be next.